45. Walls are framed inside; decks and steps are built outside
Next up was framing interior partition walls for the washrooms, storage
room and kitchen. I had been in touch with the building inspector and had
made a few changes to the layout of these rooms (see the
revised
floor plan). Some of the changes were actually his helpful suggestions.
The
Building Permit
(a public record) required an inspection once the framing was complete.
I was pleased to receive a compliment from the building inspector on the
quality of our carpentry! With the inspection passed, I turned my attention
back outdoors to steps and decks. A member gave me some help with putting
in the posts for the deck on the east side of the clubhouse. Otherwise,
it was just me and my wife working until it got too cold to continue on.
We managed to get pretty much everything done except the railings and balusters.
It was really wintry on our last day at the park!
These photographs from my personal collection were taken in October
and November 2013. Please contact me if
you'd like to learn more about them. Click or tap to enlarge, or view all
photos enlarged (1000px).
Banner image © 2017 Google. Satellite image capture August 24, 2015.
Gate image © 2019 Google. Street View image capture October 2018.